East 8th Street: Demo Phase

We are well under way with the demo phase at our E 8th Street project in South Boston. The interiors of both properties have been gutted down to the studs and three layers of siding have been stripped off the exterior. In case you missed the "before" pictures of these properties, check out this post!

With few load-bearing walls, we were able to open up the space.

With few load-bearing walls, we were able to open up the space.

Gutting the bathrooms exposed a lot of old plumbing that we will need to replace.

Gutting the bathrooms exposed a lot of old plumbing that we will need to replace.

This is one of many dumpsters the demo crew filled.

This is one of many dumpsters the demo crew filled.

As you can see, there were multiple layers of siding we had to strip off.

As you can see, there were multiple layers of siding we had to strip off.

The crew working on exterior side 3 of 4. 

The crew working on exterior side 3 of 4.